For a train to run smoothly the railway must be flat and level. This neccassitated the building of embankments, the cutting of hilla and the tunneling of mountians. In the victorian period this was accomplished with a few basic hand tools and a lot of explosives. In the navvy construction yard I teach the correct use of explosives and demonstrate some of the tools used to cut, blast and tunnel through the british countryside.